VILOTEL
Oberkochen


Client InvestCo Gbr
Architecture arch22
Collaboration transsolar
Image credits arch22, str.ucture
Scope Structural design phase 1 - 6 & 8
Materials Reinforced concrete
Gross floor area 4000 m²
Planning period 2015 - 2018
Completion 2018

By the new construction of the Hotel emerges a building which exists respectfully but self-confident in relation to adjacent structures and forms a new collective

Starting from SD a shared Revit Building Information Model (BIM) was set up, to keep both architectural and structural model up to date at the same time. Str.ucture supports the architects in this project not only as a structural engineer but also in the development of the shared model and BIM administration. A structural hybrid of concrete frame and solid brick construction allows for high flexibility in the future. Furthermore the structural design is focused on economic efficiency. The underground parking is realized without a solid slab to save elaborate coating and the slope stabilization is utilized as foundation.